loading map...
Displaying all 127 items KML, RSS
Limit Results to:

2211 West Fourth Avenue (Capers multi-use development)

2211 West Fourth Avenue Vancouver, BC

Key Sustainability Features Ground source heat pump Double exterior wall system Thermally separated windows Often refered to as the Capers Building, this project has become a much-referenced example of green building practices. Much more than a corner market, the entire complex uses a ground source heat pump to heat and cool, a rainscreen envelope, a double exterior wall system, and thermally separated windows resulting in excellent acoustic, moisture, and insulation performance. The building’s lighting strategies maximize daylight and feature low-energy electric fixtures. Residents enjoy low-emission carpets made from recycled pop bottles, filtered water, and usable green roof space.   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/buildings/2211_west_fourth_avenue_capers_multiuse_development
Last edited by sheryl over 3 years ago

AERL - Aquatic Ecosystem Resource Laboratory

2202 Main Mall, UBC Vancouver, BC

The Aquatic Ecosystems Research Laboratory (AERL) is a four story, 6,000 m facility that serves as an interdisciplinary research facility at the University of British Columbia for The UBC Fisheries Centre The Institute for Resources Environment and Sustainability The BC Fisheries Research Unit Completed in 2006 AERL features a state-of-the-art Immersion Laboratory that simulates real-time underwater and coastal habitats. The Canada Green Building Council has awarded LEED-BC Gold Certification to UBC-AERL. A large central atrium acts as a natural ventilation stack and eliminates the need for mechanical ventilation systems. In the summer, concrete surfaces are naturally cooled in the evening, providing radiant cooling for the upper three floors during the day. Thanks to the efforts of AERL staff and student volunteers, this is the only facility on the UBC Point Grey campus to have a building-wide composting program. READ MORE

/buildings/aerl_aquatic_ecosystem_resource_laboratory
Last edited by Eesmyal Santos-Brault about 3 years ago

AFRESH Home

3700 Willingdon Ave. Burnaby, BC

This demonstration housing project at British Columbia Institute of Technology’s (BCIT) Burnaby Campus was the result of a team effort by the Canada Mortgage and Housing Corporation, BCIT, the Greater Vancouver Home Builders’ Association, the Canadian Plywood Association, UBC School of Architecture, and a host of product and service providers. Afresh Home is an affordable, durable, healthy and environmentally conscious home that is designed to change easily as the lifestyle of its occupants change. Green features include energy-efficient windows, durable building envelope, low-flush toilets and aerator taps, low-emitting building materials, and building integrated photovoltaics. www.commons.bcit.ca/chcc/afresh.html   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/buildings/afresh_home
Last edited by sheryl over 3 years ago

AIBC Headquarters

440 Cambie Street, Vancouver , BC

This retrofit project combines heritage preservation with green building design. The result is a 1911 building that has been propelled into the future, bringing new life to Victory Square. Older features of the building have been bolstered to create an interesting and pleasant space at a lowenergy cost. A central atrium was cut into the center of the building, flooding the interior with natural light. Customized cross ventilation is achieved through user-controlled windows and passive solar techniques using sunshades and louvered canopies. The building design reduces energy consumption to 20% below the ASHRAE 90.1 standard. It also takes advantage of the urban renewal opportunities offered by heritage buildings.   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/buildings/aibc_headquarters
Last edited by sheryl over 3 years ago

Aldergrove Bowl

4330 Kingsway Abbotsford, BC

Key Sustainability Features The marsh pond (1.7 ha) created by Metro Vancouver is one of the largest wildlife habitat areas in the Lower Mainland Trails for: Walking/hiking (9.5 km), horseback riding (7 km), cycling (7.5 km) Located in the heart of the Fraser Valley, Aldergrove Bowl is a beautiful and inviting habitat for plants and wildlife as well as a recreation destination for residents. What makes this area a model for sustainable practices is that it is a former gravel pit where biosolids have been used to supplement inadequate top soil to facilitate plant growth and habitat creation. "The Aldergrove Bowl", as it is known, was turned into a natural setting and functional park space with the cooperation of the former gravel pit operators. It is unlikely that it would be as lush as it is today without the use of biosolids. Their use is one of the most notable features of the reclamation project. READ MORE

/open_spaces/aldergrove_bowl
Last edited by sheryl over 3 years ago

APEG BC Headquarters

4010 Regent Street, Burnaby , BC

Now fourteen years old, the headquarters for the Association of Professional Engineers and Geoscientists of BC (APEG BC) sets a precedent for successful green design, particularly for superior natural lighting technologies. Architects worked along side APEG engineers in an integrated approach to design this successful space. The electrical systems maximize passive solar energies for lighting and heating. Most noticeable in appearance are precisely shaped “sails” that are suspended within the interior of the structure. These sails distribute natural and artificial light evenly into the interior space. Extensive glazing and fritted glass louvers on the east and south faces also contribute to enjoyable work space for APEG employees. READ MORE

/buildings/apeg_bc_headquarters
Last edited by sheryl over 3 years ago

Aquaquest: The Mary Blusson Learning Centre

845 Avison Way Stanley Park Vancouver, BC

Key Sustainability Features Waste diverted from landfill during construction: 90% Heat pump system that takes advantage of the constant temperature of adjacent seawater Rainwater capture and reuse Water savings: an estimated 1,480,000 litres of water per year (based on simulation) READ MORE

/buildings/aquaquest_the_mary_blusson_learning_centre
Last edited by Kalin Harvey over 3 years ago

Arbutus Walk

Arbutus St. between 11th and 12th Ave Vancouver, BC

Key Sustainability Features     •    Redevelopment of brownfield site    •    Redirection of population growth from suburban to urban areas    •    Reduced dependency on the automobile    •    Street calming to increase walkability    •    Increased urban open space    •    Mixed-use, mixed-income neighbourhood    •    Market and non-market (social and seniors) housingIn 1989, the City of Vancouver introduced a policy that allows the rezoning of marginal industrial land for residential use. The new policy opened up the former brewery site on the Arbutus Lands for development. The adoption of the Arbutus Neighbourhood Policy Plan came after an extensive public planning process and was an important first step in the implementation of the city’s policy.The Arbutus Neighbourhood Policy Plan reflects many of the key principles from Metro Vancouver’s Regional Growth Strategy. By identifying this marginal industrial land and allowing for its redevelopment by Concert Properties Ltd. into a liveable, high-density residential neighbourhood, the City directed growth into urban neighbourhoods that might otherwise have occurredas suburban sprawl. READ MORE

/neighbourhoods/arbutus_walk
Last edited by ibudke over 3 years ago

Ardencraig

353 West 11th Ave Vancouver, BC

Key Sustainability Features: 95% of framing timber was reclaimed Energy savings of 20%+ over conventional practice Minimal stormwater run-off This single family house built in 1910 was converted into three stacked strata-titled townhouse units with a new in-fill coach house addition. The added density gave the building a Floor Space Ratio (FSR) of 0.75. An effort was made to preserve the character of the original home. This included restoring certain interior features, preserving the wall framing and roof structure, and using reclaimed wood from demolished buildings for sheathing and framing. READ MORE

/buildings/ardencraig
Last edited by sheryl over 3 years ago

BC Cancer Research Centre

675 10th Ave W Vancouver, BC

Key Sustainability Features: Potable water consumption reduced by 43% with low flow plumbing fixtures and waterless urinals 26% of all construction and finishing materials had recycled content Annual energy savings predicted to be $381,269 $7 million under budget Finished one day ahead of schedule Water efficient landscaping reduces sprinkler requirements by 76% 77% of building materials were manufactured locally and 26% of the raw materials were extracted locally Heat recovery from the chiller offsets approximately 60% of the space heating load Energy efficient lighting is 23% more efficient than MNECB including occupancy sensors and daylight sensors Views for over 90% of spaces The B4 basement level houses one of the largest vivariums in Western Canada The BC Cancer Research Centre is a 15-storey research building that is home to 600 scientists and medical professionals conducting research into more than 200 types of cancer. It is a LEED Gold certified project, the first healthcare/laboratory facility in Canada to achieve such a high level of certification. READ MORE

/buildings/bc_cancer_research_centre
Last edited by ibudke over 3 years ago

BC Hydro Salmon Stream

Stanley Park near the Vancouver Aquarium Vancouver, BC

Key Sustainability Features: 14,000 salmon fry released in 1998, first returns in 2001. Coho returns: 27 in 2001, 28 in 2002, 4 in 2003, 100 in 2004 Since 1999, Coho Salmon accessing upstream spawning sites Lower stream utilizes waste sea water from the Vancouver Aquarium whale pools Waste recirculation system replaces park's former freshwater to wastewater stream and pond system Interpretive programming available to Stanley Park's 4 million annual visitors The BC Hydro Salmon Stream project is a human-made stream developed on the site of a former parking lot in Stanley Park. Though the $2 million sculpted concrete basin is not a stream restoration project it does help to highlight the importance of habitat restoration projects throughout the province. The Vancouver Aquarium uses the stream project as part of their mandate to promote public education and stewardship of wild salmon. The project calls attention to the life cycle of BC salmon and shows that habitat damage can be mitigated. It also shows that hard landscape areas can be reclaimed with permeable, natural surfaces. READ MORE

/infrastructure/bc_hydro_salmon_stream
Last edited by ibudke over 3 years ago

Burnaby Mountain Secondary School

8800 East Lake Dr Burnaby, BC

Key Sustainability Features Urban Ecology Program Stoney Creek stewardship programs Stormwater management Green school building:Energy savings of $15,000 per year Annual reduction of 126,000 kg CO2 due to heat pump efficiencies The Burnaby Mountain Secondary School boasts a green school building, an extensive on-site stormwater filtration system, and a curriculum-based urban ecology outreach program, all of which reflect the school's dedication to fostering a sense of responsibility to place and community. READ MORE

/buildings/burnaby_mountain_secondary_school
Last edited by ibudke over 3 years ago

Central Valley Greenway

Vancouver, Burnaby New Westminster, BC

Key Sustainability Features: More than 23% of the population of the GVRD lives or works within 1.5 km of the greenway The greenway links 4 regional town centres: New Westminster, Lougheed, Brentwood and downtown Vancouver The greenway connects: 11 SkyTrain stations, more than 23 bus routes, more than 16 bikeways, 11 urban trails and 4 major parks READ MORE

/infrastructure/central_valley_greenway
Last edited by ibudke over 3 years ago

Centre for Interactive Research on Sustainability

West Mall Vancouver, British Columbia

Key Sustainability Features Net annual power generator: all building energy requirements supplied from on-site sustainable and renewable energy sources Waste heat recovery and geo-exchange provides 100% of space heating and cooling 40 kW solar hot water system provides approximately 60% of domestic hot water needs Energy efficiency: targeting 75 kWh/m2/year (best commercial building performance in North America) Building envelope: 25 kW array of building integrated photovoltaic panels (BIPV), operable windows, solar shading panels, natural daylighting system Rainwater collection and use: provides 100% of potable water requirements Wastewater collection, treatment, and reuse: all wastewater will be collected and treated on-site Stormwater management: control, reuse and discharge of 100% of rainwater on-site Performance monitoring: sensing, monitoring and control technologies include: LED technologies; day-lighting sensing and dimming controls; ventilation effectiveness monitoring systems; comfort, air flow, occupancy and lighting controls; and water and wastewater quality testing Public education: dissemination of sustainable design practices, knowledge, experience and technology  Use of sustainably harvested wood   READ MORE

/buildings/centre_for_interactive_research_on_sustainability
Last edited by /users/SustainabilityInitiative 11 months ago

Centre for the Advancement of Green Roof Technology

555 Great Northern Way Vancouver, BC

The British Columbia of Institute of Technology(BCIT) Green Roof Research Facility (GRRF) was designed as a dedicated field test site to monitor real-time performance of green roofs and to demonstrate the feasibility of green roofs in BC's coastal climate. The facility includes three 33m2 research roofs. One is a reference roof with no green roof system, and on either side of this roof are two green roofs. The facility has an easily accessible viewing platform for educational purposes.  The GRRF hosts a weather station which includes 93 data collection points that monitor growing medium temperature, heat loss and gain, solar radiation and reflected solar radiation, soil moisture, stormwater runoff rates, and water quality of each system.   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/buildings/centre_for_the_advancement_of_green_roof_technology
Last edited by sheryl over 3 years ago

City Farmer's Vancouver Compost Demonstration Garden

2150 Maple St Vancouver, BC

Key Sustainability Features Compost demonstration garden Outreach and education on composting and edible and sustainable landscaping Top website for urban agriculture The Vancouver Compost Demonstration Garden, operated by the City Farmer Society, is one of the pillars of Vancouver's urban agriculture movement. The organization, established in 1978, actively educates the community about sustainable urban ecology practices. READ MORE

/open_spaces/city_farmers_vancouver_compost_demonstration_garden
Last edited by ibudke over 3 years ago

City of White Rock Green Operations Building

877 Keil St White Rock, BC

Key Sustainability Features: Stormwater collection system resulted in the elimination of over 1.5 million L of potable water used each year, a savings of 90% of site water use Potable water consumption is reduced by 88% (over 1.7 million L/year) 60% more efficient than the MNECB 5% energy from renewable technologies A water source heat pump reduces the building's annual GHG emissions by more than 5,000 kg of CO2- equivalents 98% construction waste diversion or 467,670 tonnes 31% of building materials were selected from local manufacturers. Of those materials, 75% were harvested within 800 km of the site Daylight for over 75% of spaces and views for over 90% The White Rock Operations Building is a combination office building and operations facility that houses nine full-time staff and 18 field staff. This facility is also the base for the city's fleet of civic utility and street washing vehicles. READ MORE

/buildings/city_of_white_rock_green_operations_building
Last edited by sheryl over 3 years ago

C.K. Choi Institute for Asian Research

1855 West Mall UBC Vancouver, BC

Key Sustainability Features Minimal site disturbance Maximum daylight penetration into building Lights regulated by sensors Reuse of local salvaged materials Wastewater reduction strategies When the C.K. Choi Building was opened in June 1996, it set a benchmark for green design in North America. Front-loaded with an emphasis on design, it used an integrated design process that required that engineers and architects to work together in close collaboration. READ MORE

/buildings/ck_choi_institute_for_asian_research
Last edited by ibudke over 3 years ago

Collingwood Neighbourhood House

5288 Joyce St Vancouver, BC

Key Sustainability Features Social Capital and Community Relationship Building Promoting citizenship and social sustainability Volunteer network of 500 Environmental Sustainability Improving health of Still Creek Revitalization of Renfrew Ravine Organic seed swap and composting Program and Service Delivery Food Security Program assisting people to grow and share food, and providing meals to those in need Multicultural Services including ESL training and settlement assistance Family Services, including childcare and parent-support programs Youth Services, such as employment assistance and anti-violence initiatives Senior's Services Community Development Support for Resident Leadership initiatives Collaborating with other program and service providers Arts and Cultural Development Beautification of public spaces Improving connection between SkyTrain stations and community READ MORE

/programs/collingwood_neighbourhood_house
Last edited by ibudke over 3 years ago

Country Lanes

Three locations in Vancouver see below., BC

As part of its goal to create a more liveable community the City of Vancouver has developed an environmentally sustainable 'Country Lane' design as an alternative to full-width asphalt lane paving. Three 'Country Lanes' were constructed to demonstrate greener and more attractive back lanes. Locations of Lanes: Lane south of E 27th Avenue between Fraser Street and Prince Albert Street Lane east of Maple Street south of W 5th Avenue at City Farmer's Vancouver Compost Demonstration Garden (O2, p. 62) Lane south of Yale Street between North Slocan Street and North Kaslo Street READ MORE

/infrastructure/country_lanes
Last edited by sheryl over 3 years ago

Cranberry Commons Cohousing

4272 Albert St Burnaby, BC

Key Sustainability Features: Generates 50% fewer vehicle trips per household than similar buildings in similar locations Resident familiarity with the building design has enabled the implementation of post-occupancy sustainability strategies, including lighting and heating control system tuning and maintenance, and parkade lighting "de-bulbing" Cranberry Commons is a project of the Cranberry Commons Cohousing Development Corporation. This is a not-for-profit corporation that was formed by future homeowners for the express purpose of financing and directing the design and development of this multi-family residential building. The development includes 22 strata-title private homes, and a common house which includes a kitchen, dining area, children's area, library, lounge, meeting room, laundry room, work room, guest room, and storage space. READ MORE

/buildings/cranberry_commons_cohousing
Last edited by sheryl over 3 years ago

Crestwood Corporate Centre - Building 8

13775-13777 Commerce Parkway Richmond, BC

The Crestwood Corporate Centre Building Number 8 is a project of the C-2000 Program for Advanced Commercial Buildings of Natural Resources Canada. The C-2000 Advanced Building Program criteria include reducing annual energy consumption by 50% and reducing annual water consumption 40% below ASHRAE standards. Building Number 8 sits opposite its twin building, Number 7, which is built to ASHRAE standards. The two work together as a long-term case study on the costs and consequences of building technology choices.   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/buildings/crestwood_corporate_centre_building_8
Last edited by sheryl over 3 years ago

Crown Street Sustainable Streetscapes

5900-6200 blocks of Crown St Vancouver, BC

Key Sustainability Features: Alternative street design for natural stormwater management Protecting salmon bearing streams Use of recycled materials Street calming to improve pedestrian environment Crown Street represents an alternative approachto residential street design and stormwatermanagement that succeeds in beautifying the streetwhile protecting the salmon habitat of the nearbystream. The street is a narrow, meandering roadwaywith vegetated swales and retention ponds. READ MORE

/infrastructure/crown_street_sustainable_streetscapes
Last edited by ibudke over 3 years ago

David Avenue Connector

David Ave Coquitlam, BC

Key Sustainability Features: Stormwater Management: biofiltration swales, water quality pond, exfiltration (ground recharge) chamber Environmental compensation: off-channel rearing ponds, riparian plantings along Coquitlam River, Hyde Creek and Watkins Creeks, large woody debris structures in Coquitlam River, open-bottomed culverts and fish ladders at Watkins Creek, enhanced wildlife corridors, habitat to support re-listed species READ MORE

/infrastructure/david_avenue_connector
Last edited by sheryl over 3 years ago

Delta Greenfields Project

,

The Greenfields project supports preservation and coexistence of wildlife habitat and agricultural productivity in the Fraser River Delta. This is one of BC’s most productive agricultural areas and is also home to thousands of immigrating waterfowl. The Greenfields project works with farmers to plant winter cover crops such as cereal grains, rye grass, and clover that benefit both soil productivity and wildlife habitat capacity within Delta. A Monitoring and Evaluation Program continues to evaluate cover crop types and waterfowl use. In addition, the project incorporates a communication program that assists in increasing awareness of agricultural-wildlife interactions. www.deltafarmland.ca   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/open_spaces/delta_greenfields_project
Last edited by sheryl over 3 years ago

Deprecated Southeast False Creek

South shore of False Creek Vancouver, BC

Green buildings and infrastructure All public facilities will meet LEED Gold standard All private buildings must meet LEED Silver standard Green roofs as a component of stormwater management Alternative heating systems Carbon-neutral neighbourhood Traffic Demand Management Low minimum- and maximum-parking standards Required provision of spaces for car co-op (e.g. CAN) Diverse network of pedestrian and bicycle paths End of trip facilities for cyclists All residences within 5 minute walk of transit Waste Management Composting and recycling required Neighbourhood-based waste utility encouraged Ecological Landscaping Natural planting emphasized 1/3 of site to be set aside for open space. Waterfront park featuring naturalized waterfront and stormwater detention ponds 2. Heritage building within the context of a renewed streetscape Responsible parties: City of Vancouver Tours: Not available This Post Was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain READ MORE

/neighbourhoods/deprecated_southeast_false_creek
Last edited by ibudke over 3 years ago

Eagle Lake Green Energy Project

District of West Vancouver, BC

Key Sustainability Features: Micro-turbine generates approximately 1.1 gigawatts annually, equivalent to the power used by approximately 90 single family homes Will provide $700,000 net revenue over 25 years for the District of West Vancouver Only integrated green energy-community water system in BC The Eagle Lake Micro Power Generation project is an award-winning independent energy project. Pacific Cascade Hydro Inc. launched the project to harness hydroelectricity from the district's water supply system in partnership with the District of West Vancouver. The initial feasibility study for the project was subsidized with a grant through the Green Municipal Funds, a federal-municipal partnership for the support of innovative projects that protect the environment. The project is the only one of its type in British Columbia and provides a notable example of green energy generation as a by-product of community water systems. READ MORE

/infrastructure/eagle_lake_green_energy_project
Last edited by ibudke over 3 years ago

Earthwise Garden

6400 3rd Ave Delta, BC

Key Sustainability Features: Outreach and education on sustainable living Workshops on composting, beneficial insects, organic landscaping and farming  READ MORE

/open_spaces/earthwise_garden
Last edited by ibudke over 3 years ago

East Clayton

North Surrey, BC

Key Sustainability Features Green Infrastructure: extensive greenway network Stormwater management plan: natural drainage system incorporating surface detention and infiltration; reduced erosion and habitat loss through management of run-off discharge Pedestrian-oriented: shops and transit within 5-minute walk Habitat protection: preservation of riparian areas with restricted human access Open space: school and park sites to contribute to infiltration and bird habitat The City of Surrey’s ongoing development of the East Clayton neighbourhood is the outcome of a participatory planning process initiated by the city and undertaken with the assistance of the James Taylor Chair in Landscape and Liveable Environments at the Design Centre for Sustainability at UBC. Both the city and the Chair are committed to developing a complete and sustainable neighbourhood in East Clayton. READ MORE

/neighbourhoods/east_clayton
Last edited by ibudke over 3 years ago

Envision Financial Services Willoughby Branch

20193 64th Ave Langley, BC

Envision Financial Service’s credit union is LEED© Certified. A delightful interior space for both employees and members, it is dedicated to the health and vibrancy of its local community in more ways than one. In order to cut down on capital and environmental costs, care was taken to incorporate 16% recycled materials into the building design. Fifty percent of materials used are manufactured locally. Water use within the building is reduced by 40% by using dual flush toilets, waterless urinals, and water efficient landscaping. With almost 360 degrees of daylight, indoor electrical lighting has been greatly minimized. Envision Financial Services adheres to the Green Power Certificates (GPC) program.   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/buildings/envision_financial_services_willoughby_branch
Last edited by sheryl over 3 years ago

False Creek South

South Shore of False Creek Vancouver, BC

Key Sustainability Features 10.5 hectares of green and open space in city centre Foreshore improvement Brownfield redevelopment of former industrial site First public access to False Creek Early example of large-scale brownfield redevelopment in Vancouver Precedent-setting development Limits on vehicles Pedestrian-oriented Target of 1/3 low-income, 1/3 middle-income, 1/3 market housing Housing forms include market units; townhouses and apartments for families; non-market housing in the form of co-ops and non-profit rentals READ MORE

/neighbourhoods/false_creek_south
Last edited by ibudke over 3 years ago

Five

73-91 East 27th Ave. Vancouver, BC

“Five” is an extensive restoration of five detached dwellings originally built in 1912, and now on the City of Vancouver Heritage Register. The detached homes of 130 m2 each are contained on a single city lot. Preservation and restoration of the existing structures allowed the developer to retain the existing density of 1.3 FSR, which is approximately double the currently permitted density. To reduce energy use, the project uses  “on-demand” in floor radiant heating and hot water, double Low-E and argon filled windows, Energy Star appliances, and Forest Stewardship Certified wood. The project anticipates a 12 tonne per home per year reduction in greenhouse gas emissions. Source: http://www.rethinkingbuilding.com/projects/design.php?c=1_2&s=1_2 Technology: Direct "Tankless" Hot Water System, Double Low-E and Argon Windows, Energy Star Appliances     READ MORE

/buildings/five
Last edited by Kalin Harvey 7 months ago

Fred Kaiser Building

2332 Main Mall UBC Vancouver, BC

Key Sustainability Features Low Flow Fixtures reduces potable water consumption by 50% Energy efficient design - maximum daylighting without energy loss Building footprint used existing buildings Designed for flexibility of uses This five-storey academic building provides lab space for UBC's Electrical and Computer Engineering Faculty and offices for the Dean of Applied Science. It has 700 occupants, including faculty, researchers, administrators, and students. READ MORE

/buildings/fred_kaiser_building
Last edited by ibudke over 3 years ago

Gabrielle Roy K-12 School

6887 132nd Street Surrey, BC

The Gabrielle Roy K-12 School is a pilot project of Green Building BC, offering a healthy, sunlit environment. The use of glazing and solar shades on the southern façade allows light and solar heat to enter classrooms, limiting solar glare and minimizing the need for supplemental light. To boost indoor air quality low-emitting materials are used including Marmoleum flooring, exposed concrete instead of gypsum wall board, and ceramic tiles. Energy efficiency strategies include demand ventilation, heat pipe heat reclaim, high efficiency windows, and lighting density at 1.1w/sq ft. Pilot projects such as this provide valuable information regarding the process and design of future green schools.   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/buildings/gabrielle_roy_k12_school
Last edited by sheryl over 3 years ago

Gleneagles Community Centre

6262 Marine Dr West Vancouver, BC

Key Sustainability Features Heated and cooled by ground source heat pump  Ventilation system provides 100% fresh air to the building Uses 40% less electricity than a conventional building of similar size Low-flow facilities reduce potable water consumption Restoration and daylighting of Larson Creek, a salmon bearing stream that crosses the property The Gleneagles Community Centre (GECC) is located on the main bus route in the District of West Vancouver. The GECC houses a gym, fitness centre, art centre, child care facility, and a customer service and support area that were designed to be universally accessible. READ MORE

/buildings/gleneagles_community_centre
Last edited by ibudke over 3 years ago

Gleneagles Public Safety Building

6272 Marine Dr West Vancouver, BC

Key Sustainability Features  Emissions reductions: 64% reduction of nitrous oxide; 21% reduction of carbon dioxide Land conservation: no need to build a large energy plant in the community; mini-plants are very compatible with dense urban environment Flexibility: designed to use a variety of fuels, including emissions-free, alternative energies  Renewable energy source: currently 120 solar hot water panels installed on the library roof The City of North Vancouver created the Lonsdale Energy Corporation (LEC) to provide a district energy service for the Lower Lonsdale and Shipyard precincts. These two areas comprise a large, dense redevelopment of residential, commercial and cultural/institutional buildings. The project is BC’s first major redevelopment project to be integrated with a community energy plan. The City is providing the domestic hot water heating needs for 300,000 square metres of buildings without having to construct a large central energy plant.     READ MORE

/buildings/gleneagles_public_safety_building
Last edited by sheryl over 3 years ago

Grandview ?Uuqinak'uuh School

2055 Woodland Dr Vancouver, BC

Key Sustainability Features: Student literacy rates in Grade 1 have climbed from 10 percent to 60 percent Between 1997-2000 the community raised $700,000 in cash and in-kind contributions to support new programs With the help of dedicated faculty, students and parents, Grandview ?Uuqinak'uuh School proudly supports unique social and environmental programs for an extremely diverse school and its surrounding community. Of particular interest is Grandview's dedication to bringing education out of the classroom and into the outdoors as a way of fostering stewardship of place, bringing beauty and ownership to the community centre, and providing a hands-on teaching tool to students. Urban gardens, designed, planted and tended by students and community members have taken over neglected space surrounding the school.  READ MORE

/buildings/grandview_uuqinakuuh_school
Last edited by sheryl over 3 years ago

Granville Island

False Creek South, below the Granville St. Bridge Vancouver, BC

Key Sustainability Features Brownfield redevelopment Revitalized mixed-use urban neighbourhood Innovative adaptive reuse of existing buildings and spaces A catalyst for the transformation of False Creek Open space Organic recycling initiative for Public Market vendors Granville Island, which ranks among Canada’s first mixed-use developments and rehabilitated urban brownfield sites, has been hailed as one of North America’s most innovative developments. Project for Public Spaces rated it as one of North America’s great neighbourhoods. The success of the Granville Island development acted as a catalyst for the transformation of False Creek. READ MORE

/neighbourhoods/granville_island
Last edited by sheryl over 3 years ago

Green Links

,

Founded in 1996, Green Links is an initiative of Douglas College’s Institute of Urban Ecology, focused on the preservation of regional biodiversity throughout the Lower Mainland. The program is based on principles of conservation biology and landscape ecology, demonstrating that increased connectivity between “nodes” of habitat leads to significant increases in biodiversity. Green Links joins isolated parks and nature preserves with restored stream and utility corridors, residential greenways, and agricultural hedgerows. Examples include the Coquitlam corridor, which connects Scott Creek, Pinnacle Creek Ravine, Mundy Park, Riverview Forest, and Colony Farm Regional Park, and the Burnaby corridor, which connects Bryne Creek Ravine Park to Robert Burnaby Park. www.douglas.bc.ca/community/urban-ecology   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/infrastructure/green_links
Last edited by sheryl over 3 years ago

Green Necklace Greenway

Keith Rd. City of North Vancouver, BC

Key Sustainability Features Urban greenway integrating recreational, ecological and sustainable transportation components Innovative civil infrastructure - traffic calming, stormwater management, urban forestry, naturalized landscapes, alternative transportation  The Green Necklace project is a 7 km long urban greenway that encompasses the Central Lonsdale district in the City of North Vancouver. Originally conceived of as part of the City of North Vancouver's 1907 town plan, the Green Necklace is part of a city-wide Greenways Plan developed in 2002 to integrate recreational, ecological and sustainable transportation components throughout the city. The Green Necklace builds on existing infrastructure to link components of the City's park and open space system in a continuous network of recreational and ecologically planned spaces providing safe, alternative transportation routes.   READ MORE

/infrastructure/green_necklace_greenway
Last edited by sheryl over 3 years ago

GVRD Waste-to-Energy Facility

5150 Riverbend Dr. Burnaby, BC

Key Sustainability Features Incinerate Solid Waste, generate steam and sold to adjacent paper recycling mill Uses 250,000 tonnes of municipal waste per year Produces 15 MW of electricity a year The Greater Vancouver Regional District’s Wasteto- Energy Facility (WTEF) was built in 1988 to incinerate over 20% of the region’s solid waste. An environmental leader from the start, it was the second facility of its kind in North America to be certified under the ISO 14001 standard for environmental management. More than a simple incinerator, it generates steam, much of which is then sold to the adjacent Norampac paper recycling mill. In 2001, engineers further improved the facility by retrofitting the mill to generate electricity from its surplus steam. This electricity is sold to an electrical utility.   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain.   READ MORE

/infrastructure/gvrd_wastetoenergy_facility
Last edited by sheryl over 3 years ago

GVTA Main Street Transit and Pedestrian Priority Project

,

The Main Street project is one of six innovative transportation projects being implemented through TransLink’s  “Urban Showcase”, in partnership with Transport Canada and Metro Vancouver municipalities. The six projects will showcase different approaches to improving air quality and reducing greenhouse gas emissions through creative transportation strategies. The Main Street project creates a more people- and transit-friendly environment.  Changes include improved pedestrian street crossings, amenities for cyclists, new bus shelters with easy to read route maps and real-time transit information, improved transit travel time and reliability, preserved on-street parking, plus public art, benches and landscape improvements.   Sources include: www.translink.bc.ca/Plans_Projects/Urban_Showcase/Main_Street/default.asp.translink.bc.ca/Plans_Projects/Urban_Showcase/Main_Street/default.asp READ MORE

/infrastructure/gvta_main_street_transit_and_pedestrian_priority_project
Last edited by ibudke over 3 years ago

Hastings Park Restoration

Hastings Park Vancouver, BC

One of Vancouver’s oldest parks, Hastings Park dates back to 1889 and encompasses 66 hectares (162 acres) in the Hastings - Sunrise neighborhood in East Vancouver. Through an intensive community initiative, a restoration plan was prepared for the greening of the site. The centre piece of the plan is the daylighting of Renfrew Creek and the creation of the Sanctuary around a bioremediation pond. The Sanctuary, the first phase of a multi-phase restoration plan, was designed to offer both riparian and upland habitat and a trail network to the public. The collection of rainwater, the separation of stormwater and sanitary sewer, and stormwater filtration are essential elements within the design of this neighborhood park. Tours: Regular nature walks are available through Vancouver Natural History Society and the Hastings Park Stewardship Group   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/open_spaces/hastings_park_restoration
Last edited by Graeme Worthy over 3 years ago

Heritage Woods Secondary School

1300 David Avenue, Port Moody , BC

Heritage Woods Secondary sets a precedent for providing students with a high quality indoor and outdoor environment that models holistic decision making. Highlights include a ground source heat pump for heat recovery, a high density boiler backup system, mechanical metering, and direct digital controls to monitor building performance. Separate exhaust systems have been installed for science fume hoods, food room stoves, art room kilns, and administration photocopiers. Natural lighting and ventilation are maximized by siting the building on an east-to-west axis, and designing academic spaces around a central daylit atrium.   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/buildings/heritage_woods_secondary_school
Last edited by sheryl over 3 years ago

Hillcrest Community Centre

4575 Clancy Loranger Way Vancouver, British Columbia

The Hillcrest Community Centre (formerly known as the Vancouver Olympic/Paralympic Centre at Hillcrest Park) is located in Vancouver’s Riley Park neighbourhood near Queen Elizabeth Park. It was the home of competition curling events during the 2010 Winter Games. The venue will now be converted to a community facility for the residents of Vancouver, housing a new community centre, ice rink, curling club, library, preschool, field house and offices, as well as an aquatic centre with indoor and outdoor pools. The entire complex is fully accessible. READ MORE

/buildings/hillcrest_community_centre
Last edited by Kalin Harvey about 1 month ago

Hughes Condon Marler: Architects Office Renovation

1508 West 2nd Avenue Vancouver, BC

The HCMA office is one of four Canadian projects selected to pilot the LEED© Commercial Interiors rating system. Committed to ‘working with less,’ use of interior load-bearing and partition walls was reduced. Local demolition projects provided framing materials. Eighty percent of construction waste was diverted from landfills, and 13% of furniture and construction materials incorporate recycled content. Water conservation is achieved by low-flow plumbing fixtures and an exterior rainwater collection system satisfies 100 % of the irrigation needs of the edible garden. Fifty-five percent of the exterior walls are glass, offering all work stations access to natural lighting and windows that open.   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/buildings/hughes_condon_marler_architects_office_renovation
Last edited by sheryl over 3 years ago

Hyde Creek Integrated Watershed Management Plan

Hyde Creek Coquitlam, BC

The [[northeast coquitlam area plan]] and the GVRD’s Livable Region Strategic Plan have identified that the Hyde Creek Watershed will likely undergo significant development over the next 15 years. The Hyde Creek Integrated Watershed Management Plan provides a plan for the protection of the watershed’s sensitive environment given this anticipated growth. Recommendations in the IWMP include: utilizing stormwater best management practices such as biofiltration swales, permeable paving and pervious landscaping; maximizing the infiltration of rainfall by disconnecting roof leads; and routing runoff from roads and parking areas to biofiltration swales and adjacent green spaces.   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/infrastructure/hyde_creek_integrated_watershed_management_plan
Last edited by Kalin Harvey over 3 years ago

Hydrogen Highway™

,

The BC Hydrogen Highway™ is a series of hydrogen and fuel cell demonstration and deployment projects including fueling stations, vehicles, stationary power, and micro-fuel cells. Testing and demonstration sites are located throughout southwestern British Columbia including Vancouver, Victoria, Richmond, Surrey, North Vancouver, and Whistler. Fuel Cells Canada, a national, not-for-profit industry association based in Vancouver, is implementing the program on behalf of Natural Resources Canada’s Canadian Transportation Fuel Cell Alliance. Projects are independently funded by the Government of Canada, private industry, and the Province of British Columbia. www.hydrogenhighway.ca   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/infrastructure/hydrogen_highway
Last edited by ibudke over 3 years ago

ICICS/CS Expansion

2366 Main Mall Vancouver, BC

The Institute for Computing, Information & Cognitive Systems (ICICS/CS) is one of the largest multidisciplinary research facilities at the University of British Columbia. Consistent with UBC’s sustainable building mandate, project goals were established to design a highly flexible facility that meets LEED© Silver standards. Innovative mechanical strategies include the use of a high performance envelope, heat recovery chiller, and a chilled/heating slab system that results in a 52% reduction in energy consumption compared to MNECB standards. Furthermore, this system reduces greenhouse gas emissions by seventy five percent, and low-flow plumbing fixtures contribute to a 37% reduction in potable water usage.   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/buildings/icicscs_expansion
Last edited by sheryl over 3 years ago

In-Vessel Composter at UBC

6035 Nurseries Rd. Vancouver, BC

The in-vessel composter is the first of its kind at a Canadian university and has been operating since September 2004. It is a large-scale, fully enclosed system capable of processing up to 5 tonnes of food waste per day and produces compost in a matter of only two weeks that is in turn used on the university lanscapes. Organic waste is collected from over 70 locations on campus each week, decreasing trips to the landfill by 54%. The composter maintains optimal temperature, moisture, and oxygen levels, thus maximizing rates of microbial decomposition and negating the use of chemicals. The enclosed system eliminates the risk of odours, leachates, and rodents, making it an extremely community-friendly device.www.recycle.ubc.ca Tours: Available upon request. Call 604-822-9456. READ MORE

/infrastructure/invessel_composter_at_ubc
Last edited by ibudke over 3 years ago

Kerr Wood Leidal Associates Office

200-4185 Still Creek Drive Burnaby, BC

Kerr Wood Leidal Associates, a consulting engineering firm, incorporated its commitment to innovative engineering and sustainability into the selection and design of its new head office, achieving a LEED© Commercial Interiors Certification. An existing office building was chosen close to public transport and bike routes. The office space was then retrofitted using energy efficient appliances and plumbing. Carpets and paints were selected for low volatile organic content, which result in excellent indoor air quality. The office has water savings 64% above standard and energy savings of 56,000 kw hours a year. Green Power Certificates (GPC) were also purchased to offset non-renewable energy consumption. READ MORE

/buildings/kerr_wood_leidal_associates_office
Last edited by sheryl over 3 years ago

Killarney Rink

6260 Killarney Street Vancouver, British Columbia

KEY SUSTAINABILITY FEATURES Diversion of 95% of concrete construction waste from landfill  Heat recovery and energy-efficient design: optimize energy performance by at least 38% Reduction of potable water use by 40% Elimination of HCFC and Halons reduce GHG and ozone-depleting gases  The Killarney Ice Rink and Lobby project replaces an aging ice rink and lobby at the Killarney Community Centre. The new lobby connects the swimming pool, ice rink, gymnasium, and administrative offices.  Targeting LEED Gold certification, the Killarney project is designed to take advantage of inherent synergies between new and existing building systems. READ MORE

/buildings/killarney_rink
Last edited by karidow about 3 years ago

Kitsun Co-op

2431 Vine St. Vancouver, BC

The Kitsun Coop is an early example of green building design. Constructed in 1978 the project consists of an existing apartment building that was refurbished and insulated, and a new infill building that incorporates a number of energy efficiency, daylighting, and passive solar heating features. The solar energy features consist of seven one and one half storey high Trombe walls, steep south facing skylights that are equipped with insulated shutters, and a solar domestic water heating system. While an innovative project when it was constructed, Kitsun has experienced less than optimum building performance over the years. Projects such as this provide invaluable guidance for future green technology and green building maintenance.   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/buildings/kitsun_coop
Last edited by sheryl over 3 years ago

Koo's Corner

560 -- 598 Hawks Ave Vancouver, BC

  Key Sustainability Features Infill development - compact high density  Heat recovery ventilators (HVRs) and greywater heat recovery, solar hot water system Building reuse and repurpose Pedestrian-oriented design  Reduced outdoor water use This six-unit strata townhouse infill development features adaptive reuse of an auto service building, Koo's Auto Service, which was built in the 1940s. Part infill, part addition, this project achieved a Floor Space Ratio (FSR) of 0.95 by renovating the existing garage building to accommodate two loft-style housing units, and building an additional four units on the former parking lot. Koo's Corner blends into the existing heritage neighbourhood through pedestrian oriented design, sympathetic massing, colour, and roof forms that reference the surrounding houses. This design approach helped to maintain liveability on a tight lot in this high density development. By maintaining the building and name of the former auto garage the project retains the visual history of the area.     READ MORE

/buildings/koos_corner
Last edited by stewartworks about 3 years ago

Life Sciences Centre

2350 Health Sciences Mall, UBC Vancouver, BC

READ MORE

/buildings/life_sciences_centre
Last edited by ibudke over 3 years ago

Light House Sustainable Building Centre

2060 Pine Street Vancouver, BC

Light House is Canada’s first sustainable building centre, which recently opened its new 5,400-square feet (approximately 502 square metre) facility at 2060 Pine Street in Vancouver. Open six days a week, Light House is a combination of green building gallery and tradeshow with ongoing displays and exhibitions to inspire and inform visitors and to help companies make new business connections. Light House also houses a green building library and an education centre. Light House is a vibrant and accessible destination for the green building industry and provides meeting space to companies and community groups.Founded in November 2005 by Simon Fraser University and Ecotrust Canada, Light House is a broadly supported non-profit market catalyst funded by the business community and its own programs and services. READ MORE

/buildings/light_house_sustainable_building_centre
Last edited by Helen Goodland about 3 years ago

Little Mountain Reservoir Reconstruction

Queen Elizabeth Park Vancouver, BC

The Greater Vancouver Regional District has successfully completed the reconstruction of the Little Mountain Reservoir, which has the strength to withstand major earthquakes, without sacrificing the tranquility and beauty of a park area. The Little Mountain Reservoir was originally built in 1911 and remains a crucial link in the region’s drinking water supply. Due to seismic and structural deficiencies in the reservoir structure, it was decided to rebuild it in a way that would address environmental, social, and economic issues in a balanced manner. The planning of this project included a public consultation process in 2003. Tours: Available upon request, READ MORE

/infrastructure/little_mountain_reservoir_reconstruction
Last edited by ibudke over 3 years ago

Liu Institute for the Study of Global Issues

6476 North West Marine Dr (UBC) Vancouver, BC

The Liu Institute for the Study of Global Issues was the second green building to be built at the University of British Columbia's Point Grey Campus. It houses a one-storey seminar wing with conference rooms and reception area and a three-storey research wing with private offices, library and board rooms. The design process involved a daylong 'project alignment' workshop during which the design team identified 60 sustainable targets for the project. The Liu Institute was designed to be 55% more efficient than the Model National Energy Code. Passive ventilation and cooling, a high-performance building envelope, and energy modeling helped to attain this energy reduction goal. Effective daylight strategies, occupancy sensors and photosensors reduce lighting loads. In order to reduce site disturbance the Liu was built on the footprint of a decommissioned student residence (Pan-Hellenic House) and its former parking lot. Low flow plumbing fixtures reduce water consumption and native plant landscaping eliminates irrigation requirements. READ MORE

/buildings/liu_institute_for_the_study_of_global_issues
Last edited by ibudke over 3 years ago

Lonsdale Energy Corporation

141 West 14th St City of North Vancouver, BC

Key Sustainability Features •    Emissions reductions: 64% reduction of nitrous oxide; 21% reduction of carbon dioxide •    Land conservation: no need to build a large energy plant in the community; mini-plants are very compatible with dense urban environments•    Flexibility: designed to use a variety of fuels, including emissions-free, alternative energies•    Renewable energy source: currently 120 solar hot water panels installed on the library roof READ MORE

/infrastructure/lonsdale_energy_corporation
Last edited by ibudke over 3 years ago

Materials Testing Facility

900 E. Kent Ave Vancouver, BC

Key Sustainability Features Building comprised of 90% recycled material Local salvaged materials Onsite stormwater management Natural ventilation The City of Vancouver's Asphalt Plant and Materials Handling Facility, located on the north shore of the Fraser River, accommodates aggregate handling and asphalt manufacturing activities. The on-site two-storey Material Testing Facility houses laboratory facilities, associated offices, and amenity spaces. This building is comprised of 90% recycled content, successfully demonstrating the economical use of recycled and reused materials in construction. The extensive use of recycled materials resulted in a savings of $140,000.   READ MORE

/buildings/materials_testing_facility
Last edited by sheryl over 3 years ago

Mole Hill

West End at Thurlow and Pendrell Streets Vancouver, BC

Key Sustainability Features 170 social housing units 60% subsidized, 40% low-market rents Use of geothermal energy Preservation and renovation of heritage homes Increased energy efficiency technology Reduced construction waste Recycled building materials CAN-partnership to reduce vehicle ownership Reduction in parking stalls in lane from 100 to 28 Reduction of width of laneway from 33 to 20 feet (6 - 10 m) Storage for 168 bicycles Mid-block greenway Water feature using stormwater Community garden Fruit trees 90% mature tree retention The Mole Hill Community Housing Society (MHCHS) is the result of a seven year campaign to preserve Vancouver's only intact Victorian and Edwardian neighbourhood. The area was originally earmarked for demolition but, in 1999, residents of the 148 city-owned affordable rental units, and affordable housing advocates convinced City Council to preserve the heritage block for social housing. The city, in partnership with BC Housing and the MHCHS, approved a project to renovate 27 of the heritage homes into 170 units of non-market housing, with an additional house and a new building developed as a day centre for people living with HIV/AIDS. READ MORE

/neighbourhoods/mole_hill
Last edited by sheryl over 3 years ago

National Works Yard

701 National Ave Vancouver, BC

Key Sustainability Features: The combination of high-efficiency fixtures and storm water collection results in a 75% reduction in potable water use, saving over 2,000,000 litres of water annually 75% of materials used in the project were locally manufactured 23% of materials used in the project were locally harvested 90% of construction waste was recycled Innovative mechanical and lighting systems use 60% less energy used than required by the Model National Energy Code for Buildings (MNECB) The mechanical system consists of a ground source heat pump system, combined with radiant panel heating and cooling The National Works Yard is an Engineering Operations Facility for the City of Vancouver that incorporates the operations of eight city branches and associated administrative support. It houses approximately 400 employees. This brownfield development was built on a former rail yard and has become a pilot initiative for the City of Vancouver to promote sustainable design practices. The Administrative Centre and Parking Operations Building were the first in Canada to receive LEED Gold Certification from the Canada Green Building Council under the LEED-BC criteria. READ MORE

/buildings/national_works_yard
Last edited by sheryl over 3 years ago

Newport Village

Newport Village (Loco Rd. and Guildford Way) Port Moody, BC

READ MORE

/neighbourhoods/newport_village
Last edited by Rachael over 3 years ago

Northeast Coquitlam Area Plan

Northeast Coquitlam, BC

Key Sustainability Features Integrated watershed management planning foundation Protection of lands within ALR for agricultural uses Restoration, enhancement and protection of sensitive areas and habitats Reduced impervious land coverage Ground-oriented housing Approximately 45% (3,400) multi-family housing units High densities within 10 minute walk of village centre Affordable/special needs housing in each neighbourhood Mix of transit-supportive land use and densities Fine-grained, walkable street pattern Traffic-calmed streets Neighbourhood designed around natural features Parks and natural areas within five-minute walk of residences Direct transit link to Regional Town Centre Dedicated pedestrian and cycling routes Transportation network accommodating cars, transit, bicycles and pedestrians NECAP is divided into a series of neighbourhood plans that are governed by the overall development concept. The neighbourhood plans are also guided by a series of integrated watershed management plans which integrate broad watershed management goals into specific land use and servicing regulations and guidelines.One of the notable development concepts is the protection of environmentally sensitive areas and lands within the Agricultural Land Reserve (ALR). The neighbourhood plans express this concept in greater detail by indicating environmentally sensitive areas and agricultural lands and targeting them for protection. READ MORE

/neighbourhoods/northeast_coquitlam_area_plan
Last edited by sheryl over 3 years ago

Old Mill Boathouse

2715 Esplanade St. Port Moody, BC

Twenty minutes from downtown Port Moody and Maple Ridge, the Old Mill Boathouse is located in the waters at Rocky Point, and plays a vital role in reinforcing the community’s connection to the Burrard Inlet. Popular with sailors, rowers, kayakers, and canoeists, the Boathouse also acts as a meeting house for local school groups, power squadrons, and a navy league. The building design mimics industrial buildings of the area, built for durability and longevity, while also allowing for ample natural light, ventilation, and sheltered outdoor activity. Salvaged from the nearby Flavelle Mill, 100-year-old fir beams frame the “Great Room” used for sport gatherings and regattas. READ MORE

/buildings/old_mill_boathouse
Last edited by sheryl over 3 years ago

Oliva

1200 block of 56th St Tsawwassen, BC

Key Sustainability Features: Mixed-use LEED Silver certification, equaling approximately 33% energy savings Pedestrian-oriented 95% of demolition materials recycled Reuse of materials from previous structure Oliva is a mixed-use residential/retail building that was the first project in Delta with LEED Silver certification. The Oliva site incorporates ground level retail, three floors of residential, and the creation of a pedestrian plaza adjacent to the ground level retail. The plaza is known as “Tsawwassen Rotary Square” in recognition of a partnership with this local service club. READ MORE

/buildings/oliva
Last edited by ibudke over 3 years ago

Omicron Head Office

500-595 Burrard St. Vancouver, BC

This downtown office is the first LEED© - Commercial Interiors Gold certified project in Canada. An open space plan integrates architectural, engineering, construction, and interior design teams, which encourages discussion across disciplines. The elimination of enclosed, private offices provides equal access to exterior views and daylight for all employees. Omicrom diverted 73% of construction waste from landfills during the building process. Sixty-one percent of building materials are from recycled sources, including rubber flooring made of recycled car tires, fiberglass insulation from recycled glass bottles, and agrifiber board made from agriculture waste.   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/buildings/omicron_head_office
Last edited by ibudke about 3 years ago

Pedal Energy Development Alternatives

,

Pedal Energy Development Alternatives (PEDAL) is a not-for-profit, community based organization committed to advancing bicycles as an environmentally friendly mode of transportation. Specifically, PEDAL promotes the use of pedalpowered technology with a focus on education and accessibility to affordable, equitable bike services. With a community economic development focus, PEDAL runs three projects: Our Community Bikes (OCB) provides a community hub for bicycle education and repair; the Pedal Bicycle Depot is a non-retail bicycle education and recycling facility; and PedalPlay is a bike art and education organization that engages in activities such as bicycle building workshops and theatrical events.   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/programs/pedal_energy_development_alternatives
Last edited by sheryl over 3 years ago

Pemberton Community Centre

7390 Cottonwood Street Pemberton, British Columbia

Key Sustainability Features Geothermal system with variable refrigerant flow heating and cooling Water and energy conservation Passive design Locally-sourced materials and trades Within easy walking distance of the town core, the Pemberton Community Centre is a multi-use facility housing the Pemberton and District Public Library as well as a Community and Fitness Centre. It incorporates state-of-the art building technology and design in order to maximize energy efficiency and enhance the quality and flexibility of the community space. READ MORE

/buildings/pemberton_community_centre
Last edited by ibudke over 3 years ago

Perkins+Will Head Office

1220 Homer Street Vancouver , BC

Key Sustainability Features Track energy usage and greenhouse gas emissions using real time dashboard Auto controlled operable windows and greenhouse style skylight 2 heat recovery units The Busby Perkins+Will Office, based in a renovated 1951 warehouse, uses dynamic green design elements to advance the comfort and usability of an older interior space. The office is organized around two large atriums that were created by cutting large holes in the floor slabs both at the centre and front of all three stories of the building. These atriums maximize daylight, natural ventilation, and provide a visual connection between floors. Automatically controlled operable windows, a greenhouse skylight, and two heat recovery units also contribute to the office operating at 40% of ASHRAE 90.1-1999. www.busbyperkinswill.ca   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/buildings/perkinswill_head_office
Last edited by Kalin Harvey 8 months ago

Photovoltaic Energy Applied Research at BCIT

3700 Willingdon Avenue Burnaby, BC

The Photovoltaic Energy Applied Research team conducts all aspects of photovoltaic system development, from the design and testing of individual photovoltaic components to the installation and commissioning of large photovoltaic systems. The PV Power Tower is one of the research team’s popular projects. It is a rectangular tower approximately 15m tall, on a 2m x 2m base with photovoltaic modules mounted on all four sides. It can function as a stand-alone or grid-connected electrical power generator. Another project, Technology Place at BCIT, uses building integrated photovoltaic systems (BIPV). www.bcit.ca   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/buildings/photovoltaic_energy_applied_research_at_bcit
Last edited by sheryl over 3 years ago

Pigeon Park Savings

92 E Hastings St Vancouver, BC

Pigeon Park Savings is a socially responsible business model providing essential banking services to residents of Vancouver’s Downtown Eastside. Pigeon Park Savings is a partnership between Vancity Savings Credit Union and the PHS Community Services Society. Pigeon Park Savings recognizes that Downtown Eastside low-income residents are entitled to financial services that meet their unique needs. With the equality of financial services for all citizens as a central goal, the bank provides homeless, drug addicted, and low income residents with a place to save and manage their money.  There are currently 3,500 active accounts as part of this program. Tours: Available upon request. READ MORE

/programs/pigeon_park_savings
Last edited by Kalin Harvey over 3 years ago

Pomaria

1475 Howe St Vancouver, BC

Key Sustainability Features 45% energy consumption below the MNECB 30% reduction in water use 25% reduction in stormwater run off READ MORE

/buildings/pomaria
Last edited by ibudke over 3 years ago

Portland Hotel and Potluck Cafe

20 West Hastings St Vancouver, BC

Formed in 1993, the Portland Hotel Society (PHS) grew out of a commitment to work with a population of people who at that time found it virtually impossible to secure stable housing and support services of any kind. The overall aim was to improve the quality of life for local residents, achieve stable housing for low-income residents, reduce crime, and improve health in the community. READ MORE

/programs/portland_hotel_and_potluck_cafe
Last edited by ibudke over 3 years ago

Port Moody Public Safety Building

3051 St. Johns St. Port Moody, BC

The Port Moody Public Safety Building was completed in 2006 for community resources such as disaster relief and police and ambulance services, and is appropriately placed in a visible and accessible location in the centre of Port Moody. The building is highly energy efficient, employing geothermal HVAC with full electric stand-by generation.  Indoor considerations include the purchase of office furniture made from 100% recycled, low-emission materials, and extensive daylighting for each workspace. The building is close to Slaughter House Creek, a salmonid-bearing stream, efforts were made to reduce impacts to this waterway, including a 15m vegetated buffer along the riparian zone. Tours: Available upon request. Call 604-461-3456. READ MORE

/buildings/port_moody_public_safety_building
Last edited by ibudke over 3 years ago

Port Moody Recreation Centre

300 Ioco Rd Port Moody, BC

The Port Moody Recreation Centre was originally built in 1970 and 1972, and is the largest single user of energy in the city. After implementing a Life Cycle Costing Analysis, the city decided to retrofit the existing building with new lighting and HVAC systems. The city’s retrofit saves it $28,000 annually in energy costs, provides residents with a healthier place to exercise, and showcases energy saving techniques to an entire community. T8 fluorescent fixtures with electronic ballasts and transparent tube shields were used. The building boasts a 26% electrical energy reduction and an 18% gas reduction annually.   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/buildings/port_moody_recreation_centre
Last edited by sheryl over 3 years ago

Prince Edward Way Waterwise Blooming Boulevards

Prince Edward Way 41st Ave. to S.E. Marine Dr. Vancouver, BC

Prince Edward Way Waterwise Blooming Boulevards is a beautification and environmental enhancement project consisting of a series of gardens planted along Prince Edward Street. Residents initiated the project through a proposal to Vancouver Park Board’s Neighbourhood Matching Fund. Over thirty boulevard gardens have been planted with a diversity of drought tolerant plant species, transforming roadways and creating a unique identity for the neighbourhood. The gardens highlight the beauty, low maintenance, drought tolerance, and water conservation of native vegetation.   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/open_spaces/prince_edward_way_waterwise_blooming_boulevards
Last edited by sheryl over 3 years ago

Quayside Village Cohousing

510 Chesterfield Ave City of North Vancouver, BC

Key Sustainability Features Compact development: reduces resource use and energy consumption Affordable housing: five units Active transportation: only 23 parking spaces Composting Recycling: 63% of all garbage Re-use of on-site materials for construction Energy efficiency: designed with BC Hydro's Powersmart Program and BC Gas Energy Efficiency Program Greywater reuse system Located in North Vancouver's Lonsdale district, Quayside Village is a 19-unit, medium-density cohousing development that was planned, designed, and developed by its residents with a green mandate. READ MORE

/buildings/quayside_village_cohousing
Last edited by ibudke over 3 years ago

Revenue Canada Building

9755 King George Hwy Surrey, BC

This five-storey office building is the product of a 1997 Public Works Canada competition, setting a precedent for green office design that is both efficient and elegant. The competition required an “advanced office building” within a competitive building budget. The building has won five awards. Besides striving to be energy efficient and environmentally sustainable, the design focused on employee comfort and workspace flexibility. To decrease construction costs and waste, recycled glass was used as an infill material and 90% of existing vegetation was maintained. Technology: Sensor based energy management of energy needs. READ MORE

/buildings/revenue_canada_building
Last edited by ibudke over 3 years ago

Richmond Caring Place

140-7000 Minoru Blvd. Richmond, BC

Richmond Caring Place Society houses several non-profit community service agencies, offering the community of Richmond a central, convenient facility for a variety of services. At Richmond Caring Place, community service agencies achieve synergistic benefits from sharing a common location. Advantages for member agencies include collaborative programming, access to shared meeting rooms, and affordable, predictable operating costs. The Richmond Community Services Centre Society began fundraising to build Richmond Caring Place in 1985. In 1994, Richmond Caring Place Society was formed as a successor. READ MORE

/programs/richmond_caring_place
Last edited by karidow over 3 years ago

Richmond City Hall

6911 No. 3 Rd. Richmond, BC

Richmond City Hall’s large, central atrium floods a two-storey circulation pathway with natural light providing a pleasing, spacious environment. Occupants have access to operable windows, individual temperature controls, and access to the outdoors through balconies. Designed to use 26.4% less energy than the MNECB, a comprehensive energy reduction strategy results in an annual energy savings of $32,700. Heating is provided with an efficient four-pipe fan coil system, and a ceramic frit on the west exterior façade provides shading which in turn reduces solar heat gain by 50%. Landscaping maintained existing tree groups on site, and reduced water consumption with an efficient drip irrigation system. Technology: Heating through 4-pipe Fan Coil System; Ceramic Frit provides shading reducing solar heat gain by 50%. READ MORE

/buildings/richmond_city_hall
Last edited by ibudke over 3 years ago

Richmond Olympic Oval

6111 River Road Richmond, British Columbia

Key Sustainability Features Roof constructed from pine-beetle infested wood: sourced and fabricated in British Columbia Energy-efficient waste heat recapture system Innovative rainwater collection, cleaning and recycling system: reduces potable water consumption by 20-30% The Richmond Olympic Oval is located along the banks of the Fraser River in Richmond. Its eye-catching roof showcases sustainable and innovative wood engineering designed by British Columbia companies. READ MORE

/buildings/richmond_olympic_oval
Last edited by ibudke about 3 years ago

Roundhouse Community Centre

181 Roundhouse Mews Vancouver, BC

Sitting at the junction of Davie and Pacific Streets, the Roundhouse was once the most western hub of the Canadian Pacific Railway. In the 1800s it housed and serviced steam locomotives. Since then, the building, like the steam train, has come and gone, only to make an exciting comeback during Expo ’86. Its fate as a thriving community centre was sealed in the mid-1990’s when local enthusiasts rallied to resurrect the Roundhouse. The Roundhouse Community Centre inspires life-long learning, health, and creativity in a space visually grounded in Vancouver’s pioneering history. www.roundhouse.ca Tours: Open to the public. READ MORE

/buildings/roundhouse_community_centre
Last edited by ibudke over 3 years ago

Salt Building

85 West 1st Avenue Vancouver, BC

KEY SUSTAINABILITY FEATURES Heritage preservation: re-use of materials Natural ventilation and lighting Neighbourhood Energy Utility (NEU) Locally and regionally-sourced building materials Community health and resilience through adaptive design The Salt Building is an iconic historical landmark in the new Southeast False Creek (SEFC) neighbourhood, which is home to the Olympic Athletes’ Village. It is located on First Avenue and Manitoba Street, at the former shoreline of False Creek. Built in the 1930s when the shoreline bristled with ship builders, steel fabricators and sawmills, the Salt Building embodies the legacy of the rich industrial past of this neighbourhood. Originally, the building was used as a refinery of salt, which was shipped from San Francisco. The north end of the building retains a small dock-like structure where the salt was loaded and unloaded. As railway transportation gradually replaced shipping, the building reoriented to the south and was later converted to a paper recycling plant. It is now owned by the City of Vancouver, and in 2011 a new bakery, coffee shop and brewpub will make the historic Salt Building an important gathering place for the local community. The rehabilitation of the Salt Building, initiated in 2007, presented a rare opportunity to integrate the concepts of adaptive reuse and heritage conservation, in the context of sustainable practices, as identified by the LEED Core and Shell (CS) system.  As a result, the Salt Building is one of very few heritage projects to achieve Gold certification under LEED – CS in Canada. The rehabilitation included shell restoration and raising the building on piling extensions to align with the new street level. This also served to highlight the original exposed timber piles on which the building rests, providing a sense of layered history of the site. Its large, open interior, supported by elaborate roof trusses, creates a unique amenity for the community. The Salt Building meets LEED Gold requirements by utilizing natural ventilation and lighting, a Neighbourhood Energy Utility (NEU), and the reuse of materials. READ MORE

/buildings/salt_building
Last edited by stewartworks about 3 years ago

SEFC Community Centre

1 Athletes Way Vancouver, British Columbia

The South East False Creek Community Centre is located on the False Creek waterfront, in the heart of the Vancouver Olympic and Paralympic Village. During the 2010 Winter Games the building was used as office space for the Olympic and Paralympic mayor, management staff and Four Host First Nations, and also hosted amenities for athletes. The facility will now be converted to a two-level, 4,227 square metre community centre including a child-care facility, a non-power boating centre, and space for a restaurant. It will be targeting LEED Platinum certification. READ MORE

/buildings/sefc_community_centre
Last edited by Eesmyal Santos-Brault 4 months ago

SEFC Neighbourhood Energy Utility

1890 Spyglass Place Vancouver, BC

The Neighbourhood Energy Utility (NEU) is an environmentally-friendly community energy system that provides space heating and domestic hot water to all new buildings in Southeast False Creek (SEFC). READ MORE

/buildings/sefc_neighbourhood_energy_utility
Last edited by alexg about 3 years ago

SEFC Net Zero Building

Southeast False Creek Vancouver, BC

Key Sustainability Features Passive design: enhanced building envelope, including triple-pane windows; innovative vertical ventilation system with air expelled by passive rather than mechanical means Energy efficiency and enhanced thermal comfort: capillary mat radiant heating systems and heat recovery system Renewable energy production: solar thermal array system Occupant awareness and engagement: energy display system in each suite allows for monitoring and adjustment of energy and water consumption Energy efficiency: 68% reduction of energy consumption anticipated The Southeast False Creek (SEFC) Net Zero building, located in Southeast False Creek, is Canada’s first net zero multi-unit residential building. The goal of net zero buildings is to produce as much energy as they consume on an annual basis. It is an eight-story affordable seniors residence with 67 units, including six street-level townhouses.  READ MORE

/buildings/sefc_net_zero_building
Last edited by Kalin Harvey over 3 years ago

Semiahmoo Library & RCMP District Office

1815 152nd St. Surrey, BC

The Semiahmoo Library & RCMP District Office share the first LEED© Silver certified building in the City of Surrey, providing two important community services under one roof. A raised access floor system facilitates adaptations in space and design, making efficient use of available land. The building incorporates impressive water efficiency techniques with waterless urinals that each save 160,000 litres of water annually, reducing facility water consumption by 41%. High-performance glass, and reflective roofing contribute to a total energy consumption that falls 45% below ASHRAE 90.1 standards. Total capital costs are 28% below that of other municipal libraries. Technology: Water Efficiency; High Performance Glass; Reflective Roofing Tours: Available upon request. READ MORE

/buildings/semiahmoo_library_rcmp_district_office
Last edited by ibudke over 3 years ago

Spanish Bank Creek Daylighting

Pacific Spirit Park to Spanish Bank Beach Vancouver, BC

Key Sustainability Features: Habitat restoration: Spanish Bank Creek is one of three salmon bearing streams in Vancouver; restored riparian habitat has attracted species such as river otter, mink, eagles and heron; annual spawning returns occurring since 2001 Green infrastructure: a box culvert under the pedestrian trail allows fish passage during all flow levels; infiltration swales on the perimeter of the riparian area filter stormwater from adjacent parking lots READ MORE

/infrastructure/spanish_bank_creek_daylighting
Last edited by ibudke over 3 years ago

Squamish Lil'Wat Cultural Centre

4584 Blackcomb Way Whistler, British Columbia

  KEY SUSTAINABILITY FEATURES Site-sensitive design: minimized site disturbance and emphasis on natural assets Water and energy efficiency Cultural significance: Show-casing cultural traditions of the Squamish and Lil’Wat First Nations Capacity building: employment and leadership training for First Nations Embodying the form, materials and scale of local First Nations traditional architecture, the Squamish Lil’Wat Cultural Centre showcases the history and cultures of the Squamish and Lil’Wat First Nations, whose traditional territories overlap in the Whistler area. The design of the Centre reflects their mutual respect, commitment to collaboration and a deep-rooted environmental ethic.   READ MORE

/buildings/squamish_lilwat_cultural_centre
Last edited by ibudke over 3 years ago

Stanley Park Popcorn Stand

Stanley Park Vancouver, BC

When the Stanley Park Ecology Society decided to replace an aging popcorn stand, they decided to create a new green structure in its place. The society chose to build a cob building since it met the Park Board’s criteria of an environmental, arts and culture, and community building. Cob is a form of natural building that uses almost all natural and locally-sourced building materials. The small cob popcorn stand was a collaborative project between the Vancouver Park Board, Stanley Park Ecology Society, The Down To Earth Building Bee, UBC engineering and the BCIT green roof research facility. 200 volunteers contributed time and energy to its construction. Location: Adjacent to the miniature train station and children's farmyard www.stanleyparkecology.ca Tours: In public park. READ MORE

/buildings/stanley_park_popcorn_stand
Last edited by ibudke over 3 years ago

Stanley Park Stormwater Treatment Wetland

Lost Lagoon, Stanley Park Vancouver, BC

Key Sustainability Features: Filters and absorbs contaminants in stormwater such as hydrocarbons and metals Eliminates the need for resource-intensive materials such as pre-cast concrete and PVC pipe used in traditional stormwater drainage systems Eliminates infiltration of contaminated stormwater into Beaver Lake and surrounding forest Recreates the historic vegetated marshland surrounding lost lagoon READ MORE

/infrastructure/stanley_park_stormwater_treatment_wetland
Last edited by ibudke over 3 years ago

Stantec Vancouver Office

111 Dunsmuir St. Vancouver , BC

Stantec took the opportunity to pilot the LEED® Commercial Interiors program. In so doing they not only created a healthier, more enjoyable place to work, but were key in advancing efforts to increase green building options for the workplace. This project is distinguished by its tremendous efforts to reduce, reuse, and recycle materials, where 40% of the materials are from salvaged sources, and an impressive 86% of all construction-related waste was diverted from landfills. Among its qualities, this building uses zero ozone-depleting CFC’s, occupancy-sensored light controls, exterior views for natural lighting and occupancy comfort, end-of-trip amenities, and a green housekeeping program. Technology: Sensor-based management of energy needs. READ MORE

/buildings/stantec_vancouver_office
Last edited by ibudke over 3 years ago

Still Creek Enhancement

3003 Grandview Hwy. Vancouver, BC

Key Sustainability Features: Community art installation by high school students Complex native stream and riparian (streamside) ecology READ MORE

/open_spaces/still_creek_enhancement
Last edited by ibudke over 3 years ago

Stormwater Management at UBC

UBC Campus Vancouver, BC

The UBC stormwater management pilot project is an experiment in alternative parking lot design with the goal of evaluating how well different design options minimize cost, reduce stormwater runoff flow and volume, and improve runoff quality.  The project includes three alternatives: a conventional asphalt surface with curb-and-gutter, catchbasins and stormdrains; an asphalt lot draining to an infiltration chamber (rain garden); and a permeable lot using a plastic grid geotextile with gravel in the aisles and grass and structural soil in parking spots. This project demonstrated that there is a less than 5% difference in construction costs between conventional and non-conventional stormwater management options. Tours: Open to public. READ MORE

/infrastructure/stormwater_management_at_ubc
Last edited by ibudke over 3 years ago

Strathcona and Cottonwood Community Gardens

601 Keefer St Vancouver, BC

Since 1987, Strathcona Community Gardens has been cultivating 2.83 hectares of urban land to provide food for local residents and to educate the public. As a purely volunteer-driven community-based initiative, the intention of the garden is to promote sustainability and urban agriculture while providing local residents with the means to grow fresh food and create habitat for wildlife. Due to overwhelming demand, the site was expanded in 1991 to include the Cottonwood gardens. These gardens transformed a former city dump site into a vibrant landscape that provides individual garden plots as well as on-site education resources. The Strathcona and Cottonwood gardens have received local recognition and awards as well as international acclaim. READ MORE

/open_spaces/strathcona_and_cottonwood_community_gardens
Last edited by ibudke over 3 years ago

Surrey Transfer Station

9770 192nd St. Surrey, BC

Sustainability promotion and monitoring is a central focus of the GVRD. The Surrey Transfer Station was developed on successfully remediated brownfield industrial land. This facility was designed and constructed using the LEED© rating system and is one of the first such certified industrial buildings in Canada. It has LEED Silver certification. Water flow control fixtures reduce water use by 30%, and native, drought-resistant landscape design reduces the need for irrigation. The use of natural light decreases electricity and heating requirements. High-recycled content construction materials were used wherever possible. Bicycle storage and change rooms are provided for staff, public transit is nearby, and the facility has an on-site charging station for electric vehicles. Tours: Available upon request. READ MORE

/buildings/surrey_transfer_station
Last edited by ibudke over 3 years ago

Sustainability Street Project

Stores Rd. UBC Vancouver, BC

READ MORE

/infrastructure/sustainability_street_project
Last edited by ibudke over 3 years ago

Suter Brook Village

Inlet Centre Port Moody, BC

Suter Brook Village is being developed on a 22-acre (8.7 hectare) brownfield site in the City of Port Moody. The city and the developer, the ONNI Group, conceived the development as a neighbourhood that will retain and enhance the natural environment, in particular Suter Brook, one of the few remaining urban streams in Metro Vancouver that remains a viable habitat for salmon. READ MORE

/neighbourhoods/suter_brook_village
Last edited by ibudke over 3 years ago

Taylor Park Elementary School

7590 Mission Ave Burnaby, BC

Key Sustainability Features Solar heat and waste heat heats courtyard Point-of-use water heaters Demand ventilation system READ MORE

/buildings/taylor_park_elementary_school
Last edited by ibudke over 3 years ago

Technology Enterprise Facility III

6190 Agronomy Rd Vancouver, BC

UBC’s Technology Enterprise Facility III (TEF III), developed by Discovery Parks Trust, is designed for multi-disciplinary research and development in the biomedical field. This six-storey building is Canada’s first LEED® Silver Certified research facility, and is the first building on a Canadian university campus to achieve LEED certification. The building was constructed using locally manufactured and salvaged materials to reduce the intensity of resource use. Thirteen percent of total building materials contain post-consumer and post-industrial content such as concrete with 30% fly ash. Bi-stable vortex fume hoods and innovative design technologies were incorporated to reduce the operating costs by 50% through a reduction in air flow capacity. Tours: Not available. READ MORE

/buildings/technology_enterprise_facility_iii
Last edited by ibudke over 3 years ago

Terasen Gas Coastal Facility

16705 Fraser Highway Surrey, BC

This building is the flagship of five buildings in the Terasen Gas Coastal Facilities Project, successfully maintaining high energy efficiency and environmental standards since its completion five years ago. Siting and design of the building respond to solar and wind patterns on site, and the building includes a curtain wall with operable windows on the north façade and external shades on the south facade. High performance glazing, high levels of insulation, and displacement ventilation in access flooring throughout combine to achieve the energy performance target. The buildings energy system was designed to perform 37% better than MNECB. Tours: Available upon request. READ MORE

/buildings/terasen_gas_coastal_facility
Last edited by sheryl over 3 years ago

Thain Creek Daylighting

2800 Block of Westview Dr District of North Vancouver, BC

Key Sustainability Features Habitat restoration: annual Coho salmon returns to upstream habitat since 1999; steelhead trout fry are spawning in the constructed channel; bioengineered channel banks are planted with native vegetation, increasing the potential for a healthy riparian habitat Community engagement: special interest groups, neighbours, and stakeholders provided input for the conceptual design READ MORE

/infrastructure/thain_creek_daylighting
Last edited by ibudke over 3 years ago

The Brook

650 Evergreen Place North Vancouver, British Columbia

KEY SUSTAINABILITY FEATURES Geothermal well-water system:  83% reduction in municipal water use Energy-efficient building design: 67% cost-savings for homeowners Locally sourced building materials and supplies The Brook is a residential development in North Vancouver, developed by Streamline Properties Inc., a Vancouver-based company specializing in the development of boutique green buildings. The development is located close to natural amenities and transit services on a site previously occupied by a gas station. Aiming for LEED Platinum certification, the Brook has anticipates energy cost savings for homeowners of over 67 percent. READ MORE

/buildings/the_brook
Last edited by karidow about 3 years ago

The Cornerstone

8998 University High St. Burnaby, BC

Key Sustainability Features: Geothermal heating Diverse, compact community Market, non-market, and rental multi-family Mixed-use Pedestrian and Cyclist-oriented street design All development within 400 m of transit facilities Required cyclist end-of-trip facilities Fine-grained, narrow, traffic calmed street network Transit-oriented features Bus loop at heart of town centre Shuttle service to SkyTrain True to its name, The Cornerstone is an essential element in SFU's UniverCity (http://www.seatoskygreenguide.ca/neighbourhoods/univercity) master plan. A mixed-use residential, retail and office building, The Cornerstone is adjacent to a bus transit loop, an extensive pedestrian and bike-path system, and is in walking distance to a local elementary school, community centre, and proposed neighbourhood park. READ MORE

/buildings/the_cornerstone
Last edited by sheryl over 3 years ago

The Federal Building at 401 Burrard

401 Burrard St Vancouver, BC

Public Works and Government Services Canada (PWGSC) manages real estate for the Federal Government amounting to 6.7 million m2 of space. The green fit-up for 401 Burrard is an example of an organization taking incremental steps towards green design. The fit-up featured the installation of several green flooring options including natural wood, bamboo, cork, linoleum, stained concrete, ceramic tiles, and recycled content, low-emission carpets. This allows PWGSC to test the performance of these materials over time, informing the design of future buildings. The building is situated downtown, giving staff the option to take public transportation to work.   This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain. READ MORE

/buildings/the_federal_building_at_401_burrard
Last edited by sheryl over 3 years ago

The Silva

121 West 16th St City of North Vancouver, BC

Key Sustainability Features Daily water usage is 43% below the GVRD average of 320 L per person per day Energy efficient strategies result in cost-savings of $16,000 per year 27% reduction in rate and quantity of stormwater run off Over 50% of materials (by value) manufactured locally READ MORE

/buildings/the_silva
Last edited by ibudke over 3 years ago

The Verdant

9191 University Cr Burnaby, BC

Key Sustainability Features An estimated 60% reduction in potable water use over GVRD average 60%+ energy cost savings over conventional building design Improved air quality based on ventilation strategies and careful materials selection Emphasis on selection of local materials and recycled content building products Completed in 2007, this sixty-unit, four-storey stacked townhouse project is part of the first phase of UniverCity, the master-planned community at Simon Fraser University http://seatoskygreenguide.ca/items?q=univercity+&commit=Search. READ MORE

/buildings/the_verdant
Last edited by ibudke over 3 years ago

Tilbury Eco-Industrial Partnership

Between Hwy 90, Hwy 91, Burns Bog, and the Fraser River Delta, BC

Key Sustainability Features Based on a regional study conducted in 2003, the following potential reductions have been targeted in the Tilbury Eco-Industrial Park: Natural gas consumption by 300,000 GJ/y or 26%, an annual savings of $2.4 million Electricity consumption by 61,000,000 kWh/y or 37%, an annual savings of $4 million Wastewater generation from permitted industries by 25% Potable water consumption by 25% Truck trips by 200,000 trips per year, or 25% 15,000 tonnes of CO2 equivalents per year of greenhouse gas emissions The Tilbury Eco-Industrial Partnership (TEIP) is a member-driven initiative based upon eco-industrial networking. Eco-industrial networking (EIN) creates collaborative relationships (networks) between businesses, governments, and communities to more efficiently and effectively use resources such as materials, energy, land, infrastructure, and people. EIN provides a framework to model industrial systems upon mature natural ecosystems. READ MORE

/infrastructure/tilbury_ecoindustrial_partnership
Last edited by ibudke over 3 years ago

UBC Farm

6182 South Campus Rd. UBC Vancouver, BC

Key Sustainability Features Teaching An 800 m agroforestry trail A medicinal plant garden The Land, Food, and Community garden, used by elementary schools and featuring a cob arch and shed A taxonomy garden used by Botany classes A restored vineyard Research An arboretum containing many unusual tree specimens An allelopathy research trial A free-range poultry run used for integrated pest control research 6-10 honeybee hives A hedgerow establishment project Hybrid poplar archival plantings Conifer plantings for pine beetle resistance research A plot prepared for Agriculture Canada research on metarhizum (soil fungus) as a natural pesticide Wood preservative testing plots, riparian ecosystem research, and habitat and biodiversity sampling areas Community The Mayan society garden Musqueam garden The Downtown Eastside Aboriginal Community Kitchen Garden Project As the last working farm within the City of Vancouver, the UBC Farm is an urban agrarian gem that features a landscape of unique beauty.  The Farm’s primary steward is the Centre for Sustainable Food Systems (CSFS), an interdisciplinary program of UBC’s Faculty of Land and Food Systems.  The 24-hectare teaching, research, and community farm is located on the University of British Columbia’s Point Grey Campus in Vancouver. It is a student-driven model farm that integrates sustainable land management and food production practices with basic and applied research, innovation, education, and community outreach. There are currently more than 100 academic initiatives that take place on the farm in which 2500 students participate. READ MORE

/open_spaces/ubc_farm
Last edited by ibudke over 3 years ago

United We Can Bottle Depot

39 East Hastings St. Vancouver, BC

United We Can (UWC) was founded by Ken Lyotier in 1995. What began as a bottle depot where the local community could return recyclables for deposits - an important source of income for many - has grown into a self-described “street charity”. UWC programs now support socially and environmentally sustainable enterprises. UWC’s operating costs are covered through industrial handling fees, allowing the program to provide 24 full-time jobs as well as part-time jobs for community members and to fund a variety of other programs with minimal public assistance. Community initiatives include BikeWorks, The Happy Plants, Bintek Computer Lab and WeCan 2. www.unitedwecan.ca Tours: Available upon request. READ MORE

/programs/united_we_can_bottle_depot
Last edited by Kalin Harvey over 3 years ago

UniverCity

Simon Fraser University Burnaby, BC

Key Sustainability Features Habitat preservation: protection of more than 320 hectares of forest and wildlife habitat Stormwater management: almost 100% of rainfall returned to the ground Transit-supportive development: Canada’s only community transit pass program READ MORE

/neighbourhoods/univercity
Last edited by ibudke over 3 years ago

University Town

UBC Vancouver, BC

Key Sustainability Features Transformation from a commuter campus to a complete sustainable community REAP (Residential Environment Assessment Program) Green building program based on LEED standards Required energy- and water-efficient design, water-efficient landscaping Rainwater collection and water recycling encouraged Required use of recycled construction materials Pedestrian and Cyclist-oriented street design Residences within 250 m of greenways and 400 m of transit Fine-grained, narrow, traffic calmed street network Traffic Demand Management (TDM) TDM is an important cornerstone of the University Town vision Stats show an overall reduction in parking due to success of U-pass (universal transit program) in 2003 U-pass program to be extended to residents, faculty/staff READ MORE

/neighbourhoods/university_town
Last edited by ibudke over 3 years ago

Urban Oasis - Renfrew Ravine Sanctuary Garden

404 - 134 Abbott St Vancouver, BC

Evergreen's Urban Oasis initiative reclaims lost urban spaces and transforms them into vibrant natural areas. The project has improved and restored plant and animal habitat in seven green spaces in Vancouver and New Westminster, involving local communities in the design, planting, and maintenance of all project sites. Goals of Urban Oasis include building relationships between diverse people, reconnecting people to the environmental and cultural history of the areas, creating a culture of environmental stewardship, enhancing environmental knowledge, and improving livability of neighbourhoods. READ MORE

/open_spaces/urban_oasis_renfrew_ravine_sanctuary_garden
Last edited by ibudke over 3 years ago

Vancity Centre

183 Terminal Ave. Vancouver, BC

Vancity is Canada’s largest credit union, with $11.8 billion in assets, more than 330,000 members, and 47 branches throughout Greater Vancouver, the Fraser Valley, and Victoria.  Vancity demonstrates its leadership in environmental responsibility through its flagship facility, Vancity Centre. Straddling the Main Street SkyTrain station, Vancity’s headquarters have been encouraging the use of public transportation and supporting an economically strong downtown core for the past 14 years.  Vancity Centre has met the goal of carbon neutral operations by 2010, and is committed to a further 10% reduction in total energy use over the next three years. Tours: Not available. This building has a duplicate entry here [[Vancity Centre GBB]]; improve the site by merging it's content into this entry. READ MORE

/buildings/vancity_centre
Last edited by ibudke over 3 years ago

Vancity Lynn Creek Community Branch

1370 Main St District of North Vancouver, BC

Key Sustainability Features 30% water consumption reduction 40% energy consumption reduction 100% construction waste recycled Passive Solar Heat & Natural Light Filtering READ MORE

/buildings/vancity_lynn_creek_community_branch
Last edited by ibudke over 3 years ago

Vancouver Convention Centre Expansion

1055 Canada Place Vancouver, British Columbia

KEY SUSTAINABILITY FEATURES Green roof: 24,300 square metres of waterfront habitat Shoreline and marine habitat restoration: restoration of 60 metres of shoreline and 140 square metres of marine habitat Water conservation and reuse: black water treatment and desalinization result in reduction of potable water consumption by 60-70% Sustainable energy production: innovative aquatic sea water cooling heat pump system  Local materials: Douglas fir and Hemlock wood finishes Active transportation: 37,000 square metres of walkways, bikeways, public open space and plazas Located on Vancouver’s waterfront, the 31,600 square metre expansion of the existing Convention Centre began in November 2004 and was completed in April 2009. Aiming for LEED Platinum certification, the Vancouver Convention Centre Expansion is an international showcase of leading-edge sustainable design. Covered by the largest, non-industrial green roof in North America, and towering over an artificial reef, the Convention Centre Expansion houses its own water treatment and aquatic heat pump system. READ MORE

/buildings/vancouver_convention_centre_expansion
Last edited by karidow about 3 years ago

Vancouver Landfill Cogeneration Project

5400 72nd Ave Delta, BC

The Vancouver Landfill is owned and operated by the City of Vancouver. Since 1990, an active landfill gas (LFG) collection and flare system has prevented odours and reduced greenhouse gas emissions. In 2003, the City expanded the system and connected to a co-generation system built and operated by Maxim Power Corporation. Maxim pipes landfill gas to Hothouse Greenhouses, and burns the gas there, generating 5.55 MW of electricity for sale to B.C. Hydro, and 75,000 GJ/year of heat for sale to Hothouse. The project results in a net reduction of 40,000 tonnes of CO2 equivalents per year and the recovery of approximately 500,000 GJ/year of energy (the total energy requirements of 3,000 to 4,000 homes). Revenue is approximately $300,000 per year. www.vancouver.ca/engsvcs/solidwaste/landfill/ Technology: Active landfill gas collection and cogeneration system Tours: Available upon request. Call 604-940-3213. READ MORE

/infrastructure/vancouver_landfill_cogeneration_project
Last edited by ibudke over 3 years ago

Vancouver Olympic/ Paralympic Village

1702 Columbia Street Vancouver, British Columbia

The Olympic and Paralympic Village is part of the Southeast False Creek (SEFC) development. The SEFC site includes 32 hectares of formerly industrial lands which constituted the last remaining tract of undeveloped waterfront land in downtown Vancouver. The SEFC development has over 600,000 square meters of residential development, approximately 6,200 housing units, and an estimated total population ranging from 10,000 to 12,000 people. The first phase of the development, completed at the end of 2009, temporarily accommodated athletes of the 2010 Olympic/Paralympic Winter Games, after which it was converted into a high-density, mixed-use sustainable neighbourhood with approximately 1,100 housing units. READ MORE

/neighbourhoods/vancouver_olympic_paralympic_village
Last edited by alexg over 1 year ago

Vancouver Port Authority

999 Canada Place Vancouver , BC

 Key Sustainability Features: Design: 39% reduction in Potable Water Use, 56% reduction in energy consumption; Technology: HVAC System; 64% construction Waste was Recycled Relocating to the Canada Place building in 2004, the new Vancouver Port Authority (VPA) office achieved LEED© – CI Gold certification, meeting extremely high standards for indoor environmental quality and energy efficiency. Housing over 200 employees, this is the largest LEED-CI Gold certified project in Canada. The efforts of VPA results in a 39% reduction in potable water use, and a 56% reduction in energy use associated with lighting and HVAC systems. Sixty-four percent of construction waste was recycled, diverting it from landfills. VPA is committed to matching 100% of their office energy use with the Green Power Certificate program, and adheres to a green housekeeping program. READ MORE

/buildings/vancouver_port_authority
Last edited by ibudke over 3 years ago

Walnut Grove Community Centre

8889 Walnut Grove Dr Langley, BC

This retrofitted community centre brings new life to an older building in the Township of Langley. Economy of design is reflected in a three-layered function of acoustical panels used for daylighting, pool lane markers, and acoustics. The exposed style of the building, its materials, and HVAC systems minimize the need for off-gassing finishes. A conical skylight and extensive glazing provide the facility with mountain views and natural daylighting. Natural ventilation is provided by glazed overhead doors that run the length of the main pool. A stormwater pond is used for amenity and stormwater management, increasing on-site infiltration and reducing site runoff. Technology: HVAC System; Storm Water Pond for Management. Tours: Open to the public. READ MORE

/buildings/walnut_grove_community_centre
Last edited by ibudke over 3 years ago

West Vancouver Aquatic Centre

2121 Marine Dr. West Vancouver, BC

The original West Vancouver Aquatic Centre was built in 1974 and provided 25 years of enjoyment to the community. When a system upgrade was needed, the District of West Vancouver took the opportunity to incorporate green technologies into a facility overhaul. Operable glazed doors and windows replaced heavy, dark materials, providing an abundance of natural light, and HVAC systems were revamped, allowing natural ventilation. These features, along with views of the surrounding wooded area and mountains give the user an outdoor experience within the facility. The signature east wall of the facility uses a series of electronically-operated solar shades, allowing control of solar heat and light.   READ MORE

/buildings/west_vancouver_aquatic_centre
Last edited by ibudke over 3 years ago

Whistler Olympic/ Paralympic Village

Cheakamus Crossing Whistler, British Columbia

KEY SUSTAINABILITY FEATURES District Energy System: expected to meet up to 90% of heating and domestic hot water requirements of the development Natural stormwater management and treatment Compact, diverse neighbourhood design that supports active transportation LEED-ND pilot project Located six kilometres south of the Resort Municipality of Whistler, the Whistler Olympic Village—also called Cheakamus Crossing--was built for the 2010 Olympic and Paralympic Winter Games to house approximately 3,500 visiting athletes and officials. The compact, pedestrian-focused development supports active transportation such as walking and bicycling, as well as car sharing. It is intended to become a vibrant neighbourhood with a diverse housing mix and proximity to numerous recreational opportunities and neighbourhood services. Housing types include 221 resident-restricted homes for sale, fifty-five rental apartments for the Whistler Housing Authority, twenty market townhouses, 188 hostel beds and twenty unrestricted single-family lots. The neighbourhood also includes an Athletes Centre with the 100-room Athletes Lodge, twenty rental townhomes for athletes and the High Performance Centre. Following the Games, all of these will be managed and operated by the Whistler 2010 Sport Legacies Society. The Whistler Olympic/ Paralympic Village is one of only twenty Canadian developments designated as pilot projects for LEED-ND, which sets the highest standards in green neighbourhood design practices in North America. READ MORE

/buildings/whistler_olympic_paralympic_village
Last edited by karidow about 3 years ago

Whistler Public Library

4329 Main Street Whistler, British Columbia

KEY SUSTAINABILITY FEATURES Green roof: made from local, sustainable wood Passive design: 45-50% reduction in energy use Geothermal heat pump: meets approximately 70% of heating and cooling needs Waste diversion: 98% of construction waste diverted from landfill Locally sourced materials: approximately 33% Recycled materials: approximately 18% The Whistler Public Library was the first major project to be built following the Municipality’s adoption of the Natural Step approach/ the Whistler 2020 initiative. As such, the building was intended to showcase sustainable design principles in a visually apparent manner. The green roof, fabricated from local second growth hemlock, demonstrates an aesthetically pleasing and sustainable use of “value added” wood, which is harvested, milled and prefabricated in British Columbia. READ MORE

/buildings/whistler_public_library
Last edited by ibudke about 3 years ago

William Farrell Building Revitalization for Telus

555 Robson St Vancouver, BC

Key Sustainability Features 75% reused/recycled materials 61% energy below ASHRAE 90.1 or the MNECB Decision to recycle building saved 16,000 tonnes of solid waste landfill This decision also saved 15,600 tonnes of greenhouse emissions Building systems operations save 520 tonnes of greenhouse emissions per year Over a 75-year lifespan, this project will save 54,600 tonnes of greenhouse emissions READ MORE

/buildings/william_farrell_building_revitalization_for_telus
Last edited by ibudke over 3 years ago

Woodward's Redevelopment

100 block of West Hastings Vancouver, British Columbia

KEY SUSTAINABILITY FEATURES Energy savings target: anticipated energy savings of 33 percent Community involvement and affordability: training and hiring program for 28 local residents  Affordable housing: up to 200 non-market units; low-interest purchasing loans for 15 low-income households Local procurement of materials and services Re-purposing of underutilized steam plant for hot water generation The redevelopment of the Woodward’s building is one of the most significant and symbolic components of the revitalization of Vancouver’s Downtown Eastside and its historic neighbourhoods. Encompassing a range of market and non-market housing, stores, civic offices, and a university campus, this neighbourhood-scale redevelopment project is anticipated to attract up to 6,000 residents, shoppers, employees, students and faculty each day.  Constructed in 1903, the original Woodward’s building was Vancouver’s primary retail destination for many decades, providing food and other household necessities to residents well beyond the Hastings Street corridor. Ninety years later, Woodward’s closed its Vancouver location, forcing many of the local businesses along Hastings Street to follow suit. Over the next ten years, the building remained vacant. Finally, in 2003, the City of Vancouver purchased the Woodward’s building from the provincial government and, in 2007, issued a Development Permit for the site.  READ MORE

/buildings/woodwards_redevelopment
Last edited by karidow about 3 years ago